Question
An LPP with 4 variables and3 constraints can have a maximum of 4 basic solutions.
This statement is not necessarily true.
The number of basic solutions in an LPP with n variables and m constraints can be calculated using the formula:
C(n, __________ _____________ _______ __________ _______ ______ __________ __ ___________ ____________ ___________.
____________ ____________ _____ ___________ _____________ _____________ ___ ______ __________ ___________ ____ _____ _____________ ____________.
_______ ____ ____________ ____________ ___ __ __ _______.
____ ___________ __________ _______ _____________ _________ ___________ __________ _________ ____ ____________ _____ ____________ _____.
__ _______ _____________ ______ ______ __ _____ __ ________ _________ ___________ _____ _____________ _____________ _________.
_________ ____ __________ _____________ _______ __________ ___________ __ ________ ____ ___________ __________ _____ _________.
___________ _____ ___________ _____ ____ ___________ ______ _______ _______ __ ______ __________ ____________.
______ _______ __ ____________ ___________ ______ ________ _________ _________ ___________ _________ ___________.
______ ____________ ____ __________ ____ ________ ___ _____________.
Click Here to Order Full Assignment on WhatsApp
In any assignment problem, the optimal assignments are always along the main diagonal.
Explain various cost components of Detailed Project Report.
A fertilizer company distributes its products by trucks loaded at its only loading
station. Both, company trucks and contractor’s trucks are used for this purpose. It
was found out that on an average every 5 minutes one truck arrived and the average
loading time was 3 minutes. 40 percent of the trucks belong to the contractors.
Making suitable assumptions, determine:
i) The probability that a truck has to wait.
ii) The waiting time of a truck that waits.
iii) The expected waiting time of contractor’s trucks per day.
Distinguish between fixed assets and current assets
Explain the various methods of resolving conflicts in an organization.
An LPP with 4 variables and3 constraints can have a maximum of 4 basic solutions.
Explain turnkey contracts in power distribution? Make comparative statement of benefits of turnkey contracts vis-à-vis unit rate contracts.
Click to Contact Us
Call - 9199852182 Call - 9852900088 myabhasolutions@gmail.com WhatsApp - 9852900088